Project Initiation: Starting a Successful Project coursera quiz answers - Courseinside (2024)

Here you will get Project Initiation: Starting a Successful Project Coursera Quiz Answers

This is the second course in the Google Project Management Certificate program. This course will show you how to set a project up for success in the first phase of the project life cycle: the project initiation phase. In exploring the key components of this phase, you’ll learn how to define and manage project goals, deliverables, scope, and success criteria. You’ll discover how to use tools and templates like stakeholder analysis grids and project charters to help you set project expectations and communicate roles and responsibilities. Current Google project managers will continue to instruct and provide you with hands-on approaches for accomplishing these tasks while showing you the best project management tools and resources for the job at hand.

Learners who complete this program should be equipped to apply for introductory-level jobs as project managers. No previous experience is necessary. By the end of this course, you will be able to: – Understand the significance of the project initiation phase of the project life cycle. – Describe the key components of the project initiation phase. – Determine a project’s benefits and costs. – Define and create measurable project goals and deliverables. – Define project scope and differentiate among tasks that are in-scope and out-of-scope. – Understand how to manage scope creep to avoid impacting project goals. – Define and measure a project’s success criteria. – Complete a stakeholder analysis and explain its significance. – Utilize RACI charts to define and communicate project team member responsibilities. – Understand the key components of project charters and develop a project charter for project initiation. – Evaluate various project management tools to meet project needs.

SKILLS YOU WILL GAIN

  • Stakeholder Management
  • Strategic Thinking
  • Business Writing
  • Project Management
  • Project Charter

All quiz answers for week 1

Quiz >>Weekly Challenge 1

Q1. Fill in the blank: Project initiation includes determining resources, documenting key components, and _____

  1. onboarding the team
  2. solidifying scope
  3. establishing a schedule
  4. finalizing budgets

Q2. Fill in the blank: A cost-benefit analysis weighs the potential value of a project against money, resources, and _____ required.

  1. expectations
  2. time
  3. competitors
  4. policies

Q3. What are the key components of project initiation?

  1. Goals, scope, deliverables, success criteria, stakeholders, and resources
  2. Findings, scope, planning, deliverables, success criteria, and resources
  3. Goals, scope, planning, documentation, success criteria, and resources
  4. Findings, scope, deliverables, monitoring progress, stakeholders, and resources

Q4. Imagine you’re the project manager of a new grocery delivery service. You meet with stakeholders to decide how to measure project success. Which project initiation component are you trying to determine?

  1. Goals
  2. Scope
  3. Success criteria
  4. Resources

Q5. Imagine that the main supplier for a construction project runs out of steel girders and needs to obtain more to complete the order. Which key component of project initiation does this scenario concern?

1 point

  1. Deliverables
  2. Scope
  3. Resources
  4. Goals

Q6. A project charter adds value to projects in what three ways?

  1. Helps project managers communicate project details to others
  2. Sets up a framework for what project work the team needs to do
  3. Allows project managers to get organized
  4. Includes a plan to mitigate potential risks

Q7. Which of the following could be considered intangible benefits? Select all that apply.

1 point

  1. Customer satisfaction
  2. Income earned
  3. Employee satisfaction
  4. Brand perception

Q8. You expect that a project will bring in $15,000 USD in revenue per year. You estimate it will cost $10,000 up front. You also estimate costs of $100 per month for the first 12 months, which equals $1,200 per year. Using the formula (G-C) ÷ C = ROI, how would you calculate the project’s return on investment (ROI) after the first 12 months?

1 point

  1. (15,000 – 10,000) ÷ 11,200 = 45%
  2. (15,000 – 11,200) ÷ 15,000 = 25%
  3. (15,000 – 11,200) ÷ 11,200 = 34%
  4. (11,200 – 10,000) ÷ 15,000 = 8%

All quiz answers for week 2

Quiz >>Weekly Challenge 2

Q1. As a project manager, you’re using the SMART criteria to craft goals for your team. During the process, you ask yourself if your team can misinterpret a goal. Which SMART criteria does this question represent?

  1. Time-bound
  2. Specific
  3. Measurable
  4. Attainable
  5. Relevant

Q2. Which of the following scenarios best represents a project that is going out-of-scope?

  1. During the project weekly meeting, the project sponsor adds a new deliverable requirement that costs $10,000 USD. This addition surpasses the budget by $5,000 USD.
  2. The deliverable to present your project’s pre-launch event at a three-day, in-person conference is now an online conference. The switch reduces the costs associated with event space, travel, and people resource time.
  3. During the project weekly meeting, the project manager learns the main vendor will increase the cost of raw materials by 20% due to an international shortage.
  4. The manufacturer of one of the project deliverables just lost power after a large storm. They don’t expect to be in production for one week, delaying the project timeline.

Q3. Consider the following scenario:

The Janco Car Company is about to deliver new cars to its affiliate dealerships. Right before shipping, several dealerships say they cannot receive the cars because of showroom schedules. Janco had not planned for the various dealerships’ showroom schedules. The dealerships ask for Janco to reorganize the car shipping schedule, costing Janco hundreds of thousands of dollars.

Which of the following steps could Janco have taken to help prevent scope creep?

  1. Move the cars via airlines to keep the timelines in place.
  2. Include product delivery scheduling in the project scope.
  3. Use legal avenues to make the dealerships alter showroom schedules.
  4. Send the shipping schedule to all of the dealerships after it’s finalized.

Q4. Fill in the blank: Deliverables help project managers, team members, and stakeholders _____ and realize the impact of the project.

1 point

  1. compare
  2. adjust
  3. quantify
  4. rank

Q5. Which of the following scenarios best represents project launch?

1 point

  1. The client agrees to the initial timeline and budget.
  2. The project manager works with stakeholders to develop project goals and deliverables.
  3. The project team releases a new product.
  4. The website development team researches a specific audience through sales data analysis.

Q6. Consider the following scenario: The Director of Product requests a project cost reduction of 25%. However, they also state that the product’s final result needs to look and function as originally agreed with no additions to project workload.

Using the triple constraint model, what trade-off could the project manager use to meet the Director of Product’s request?

1 point

  1. Change the team
  2. Change the project scope
  3. Change the project goal
  4. Change the timeline

Q7. Which two of the following are examples of success criteria?

  1. Implement a training service to meet company objectives.
  2. Deliver training to all appropriate teams to ensure at least 98% of the teams are using the new tool.
  3. Create a new product feature that will satisfy customers.
  4. Meet company-wide objective of $50M in revenues.

Q8. What’s a main difference between the adoption and engagement metrics?

1 point

  1. Adoption requires more expensive tools. Engagement requires less expensive tools.
  2. Adoption is generally a one-time occurrence. Engagement is ongoing.
  3. Adoption is an external metric. Engagement is an internal metric.
  4. Adoption replaces a business metric. Engagement compliments other business metrics.

Q9. Which scenario demonstrates project landing?

  1. The car company Janco launches a new car series called the Cruiser ST. The launch is successful and all the dealerships request more models.
  2. The project manager considers positive feedback from the project sponsor as enough evidence to assume success and reports the project complete.
  3. The project manager checks back on the project in five years to see if the training program produces a 20% increase in the county’s recycling rate.
  4. The Director of Product requests to reduce the budget by 25% but the final outcome still needs to look and function as originally agreed

Q10. Suppose as a project manager you receive a request from a team member to change a process they believe will make their work more efficient. However, you know that the change may increase the workload for other team members and extend the project’s completion date. How do you best address this potential internal scope creep?

  1. Remind the team that any process changes will change project scope and may create unknown risks for the project.
  2. Ask the team member who requested the change to take on the additional work from affected team members.
  3. Request from stakeholders an additional team member to take on the additional work.
  4. Try it out as a test because the team member making the request has seniority.11.

Q11. Which of the following is true about Objectives and Key Results (OKRs)?

  1. OKRs are rarely used to determine a project’s success criteria.
  2. OKRs are mainly for team-based metrics and not for individuals.
  3. Adoption and engagement are often used as metrics to measure results.
  4. There are typically 2–3 objectives for every key result.

All quiz answers for week 3

Quiz >>Weekly Challenge 3

Q1. Who is responsible for overseeing the scope, schedule, budget, and quality of a project?

  1. Product lead
  2. Project sponsor
  3. Project manager
  4. Primary stakeholders

Q2. Which three of the following responsibilities can belong to the project sponsor?

  1. Fund the project.
  2. Play a key leadership role throughout the project.
  3. Plan and organize the project.
  4. Ensure that the project delivers the agreed upon value to the business.

Q3. Which of the following people are likely to be primary stakeholders in a project? Select all that apply.

1 point

  1. Business competitors
  2. The project team
  3. The project client
  4. The project sponsor

Q4. Which of the following are typical responsibilities of project team members? Select all that apply.

  1. Provide technical expertise
  2. Carry out day-to-day project tasks
  3. Take on multiple project tasks
  4. Initiate the project

Q5. What is the purpose of a stakeholder analysis?

1 point

  1. Meet with stakeholders to make major project decisions
  2. Identify stakeholders and determine their involvement in a project
  3. Determine which stakeholders to exclude from a project
  4. Talk to stakeholders and learn about their interests

Q6. What is the first step in a stakeholder analysis?

  1. List the stakeholders impacted by the project
  2. Assess each stakeholder’s ability to participate and find ways to involve them
  3. Determine each stakeholder’s level of influence
  4. Determine each stakeholder’s level of interest

Q7. What does the acronym RACI stand for?

1 point

  1. Responsible, Accountable, Considered, Interested
  2. Responsible, Accountable, Considered, Informed
  3. Responsible, Appeased, Consulted, Interested
  4. Responsible, Accountable, Consulted, Informed

Q8. Which three of the following situations can lead to role confusion on a project?

  1. When ownership of decisions is unclear
  2. When workloads are unbalanced
  3. When only one person is designated as accountable
  4. When team members perform overlapping work

Q9. As a project manager, you make considerations when building a team. You decide how many people should be on the team, if they have the time to work on the project, and if they have a personal incentive to work on the project. What else should you consider when building a team?

  1. Likelihood of project success
  2. Team member communication preferences
  3. Necessary skills for the project
  4. Degree of stakeholder engagement

Q10. As a project manager, you’re prioritizing stakeholders using a power grid. One stakeholder has high power and high interest. What level of engagement should the team have with the stakeholder?

  1. Manage closely
  2. Monitor
  3. Meet their needs
  4. Show consideration

All quiz answers for week 4

Quiz >>Weekly Challenge 4

Q1. Project managers use tools to accomplish which of the following activities? Select all that apply.

  1. Negotiate with vendors
  2. Keep stakeholders informed
  3. Carry out team-building exercises
  4. Manage the budget
  5. Build charts and diagrams

Q2. As a project manager, you need to update your project charter with a statement about the tangible outcome of the project. In which section of the project charter does this information go?

  1. Benefits
  2. Business case
  3. Project deliverable
  4. Project scope

Q3. Fill in the blank: A project manager creates a project charter _____ a project proposal.

1 point

  1. as an introduction to
  2. after
  3. before
  4. at the same time as

Q4. Fill in the blank: Project managers need to ensure project information is _____ through formal documentation, such as email, a presentation, or a digital document.

  1. available only to stakeholders
  2. easily accessible to everyone
  3. available only to team members
  4. easily accessible to the public

Q5. Which are examples of work management tools?

1 point

  1. Microsoft PowerPoint, Keynote, and Google Slides
  2. Microsoft Word and Google Docs
  3. Asana, Basecamp, and Trello
  4. Email and cha

Q6. The project manager needs to plan, track, and complete work across many project phases. They also need to visually represent the team’s day-to-day tasks. Which type of tool is best for these activities?

  1. A productivity tool, such as Microsoft Word
  2. A collaboration tool, such as email
  3. A work management software, such as Asana
  4. A presentation tool, such as Google Slides

Q7. Fill in the blank: As a project manager, you may use Microsoft PowerPoint, Apple’s Keynote, or Google Slides to _____.

  1. send emails
  2. manage budgets
  3. create presentations
  4. share documents

Q8. A spreadsheet is a versatile tool that helps a project manager to do what? Select all that apply.

1 point

  1. Build charts
  2. Communicate with teammates
  3. Manage budgets
  4. Track tasks
  5. Create timelines

Q9. Fill in the blank: Project managers use tools to manage _____, which typically include the project’s budget, people, and materials.

1 point

  1. project charters
  2. project timelines
  3. project resources
  4. project proposals

Q10. When developing the project charter, who does the project manager typically work with?

  1. teammates only
  2. the customer only
  3. stakeholders only
  4. teammates and stakeholders

Recap:

I hope this article would be helpful for you to find all the coursera Quiz Answers.
If this article helped you learn something new for free, let others know about this,
Want to learn more? Check out another course.

Enroll on Coursera

<<<Check out another Coursera Quiz Answers >>>

Foundations Of Project Management Coursera Quiz Answers

Building AI Applications With Watson APIs Coursera Quiz Answers

Visual Perception For Self-Driving Cars Coursera Quiz Answers

Introduction To Self-Driving Cars Coursera Quiz Answers

Manufacturing Process With Autodesk Fusion 360 Coursera Quiz Answers

<<<Check out another Leetcode solutions >>>

Leetcode Solution : Roman To Integer

Leetcode Solution : Two Sum

Leetcode Solution : Longest Substring Without Repeating Characters

Leetcode Solution : Reverse Integer

Leetcode Solution : Palindrome Number

<<<Check out another Linkedin Assessment Answers>>>

LinkedIn .NET Framework Skill Assessment Answer 2023

C Programming Language LinkedIn Skill Assessment Answer

LinkedIn Microsoft Word Skill Assessment Answer 2023

Project Initiation: Starting a Successful Project coursera quiz answers - Courseinside (2024)

FAQs

How do I get Coursera quiz answers? ›

Use “Ctrl+F” To Find Any Questions Answer. & For Mobile User, You Just Need To Click On Three dots In Your Browser & You Will Get A “Find” Option There. Use These Option to Get Any Random Questions Answer.

What happens if you fail a quiz on Coursera? ›

If you do not obtain the required passing grade on a quiz, you have two options: Option 1: You can immediately retake the quiz without review. Option 2: You can click “review chapter info” to go over course material again and then give the quiz another go.

What are the key components of project initiation quiz? ›

Key components of project initiation:
  • Project Goals.
  • Scope of the Project.
  • Project Deliverables.
  • Success Criteria.
  • Project Stakeholders.
  • Project Resources.
Oct 5, 2022

What are the key components of project initiation coursera? ›

- Define and create measurable project goals and deliverables. - Define project scope and differentiate among tasks that are in-scope and out-of-scope. - Understand how to manage scope creep to avoid impacting project goals. - Define and measure a project's success criteria.

Can Coursera detect cheating in quiz? ›

In response to this need, Coursera has developed a suite of academic integrity features that will help institutions deliver a high level of academic integrity by 1) deterring and detecting cheating and 2) accurately assessing student mastery of the material they're learning with private assessments.

How can I get answers online? ›

Answers
  1. Answers.com. User-powered question and answer platform. ...
  2. Ask a Librarian. Online reference desk service from the Library of Congress. ...
  3. Brainly. Post questions to a community of millions of students and teachers. ...
  4. Chegg Study. ...
  5. Dummies. ...
  6. eHow. ...
  7. PolitiFact. ...
  8. Quora.

Do employers take Coursera seriously? ›

Coursera certificates are different and are respected by employers and universities. This is because Coursera offers the highest quality when it comes to courses. Coursera courses are led by the top universities and companies that you could think of.

What is the passing percentage in Coursera? ›

What is a passing grade?
LetterPercentage gradePass/Fail
A90-100Pass
B80-89Pass
C70-79Pass
D65-69Pass
1 more row
Aug 18, 2022

Can you still pass a course if you fail an assignment? ›

Grades will vary from university and courses, but most of the time you don't have to re-sit an assignment to end up passing the module or even the year. Such as, if your averaged course mark is 40 or above, you can pass the module overall regardless of the failed piece of work.

What are the 7 main activities in the initiation phase? ›

Initiation Processes Activities
  • Agree to a vision for the project.
  • Define the major goals & project justification.
  • Review project charters, project change controls and lessons learned from previous projects.
  • Identify all of the project stakeholders.
  • Identify service/product owners.

What are the 5 project key elements? ›

5 Key Elements To Success In Project Management
  • IDENTIFYING CLIENTS NEEDS. Accurately identifying the client's needs is the key to ensuring that you produce the right product. ...
  • PLANNING. ...
  • MONITORING. ...
  • COMMUNICATION. ...
  • COLLABORATION.
Sep 7, 2021

What is the most important part of project initiation? ›

Establishing a project charter

The project charter is perhaps the most comprehensive and important part of the project initiation process. It answers the 3 Ws to identify the scope/objective, team members, and the possible timeframe of the project.

What are the six steps of project initiation? ›

What goes into the project initiation process?
  • Developing a business case. ...
  • Running a feasibility study. ...
  • Drafting a project charter. ...
  • Enlisting & managing stakeholders. ...
  • Selecting the right team & project office. ...
  • Putting the finishing touches.
Jun 14, 2021

What are the 3 main components of a project? ›

The triple constraint theory, also called the Iron Triangle in project management, defines the three elements (and their variations) as follows: Scope, time, budget.

Do employers verify Coursera certificates? ›

Employers Do Recognize Coursera Certificates

Different hiring managers have different perspectives about the courses available on this online learning platform, but they all value Coursera certificates.

Can professors tell if you cheat online? ›

But, just as you would have a test proctor in a regular classroom during a test, there's technology that aids in online test proctoring to ensure students are not cheating. This is done through software that uses technology to scan your biometrics to ensure you are who you say you are.

How many times can you take a Coursera test? ›

You can take the same quiz as many times as you want to.

Where can I get assignment answers? ›

Quizbroz is a great resource for online assignment help that is affordable and easy to use. You can get help with any subject, and you can get help 24/7.

Is there a website that answers any question? ›

Today, Quora is a popular Q&A websites, helping connect experts for almost any topic imaginable.

How do I search Google for answers? ›

  1. On your Android phone or tablet, open Google.
  2. Search for a place or city.
  3. Scroll down to the "Questions & answers" section.
  4. Tap See questions.
  5. Under the question, tap Answer.

Is it okay to put Coursera certificate on resume? ›

Add Coursera professional certificates to your resume

A relevant certification has the potential to improve your job prospects. As you are thinking about your next big career shift, you might consider obtaining a professional certificate through Coursera.

Is a Coursera certificate worth anything? ›

Are Coursera Certificates worth it? On the whole, yes. If you're seeking promotion, looking for a career change, or the skills you are learning are highly sought after, then a Coursera Certificate does have value and is definitely worth the investment. Coursera partners and course providers are world class.

Do people get hired from Coursera? ›

Yes, if you have the means. The certifications might not have the best recognition, but the skills you gain can be of enormous advantage to your career—even recruiters will agree with that much.

How many people finish Coursera courses? ›

A recent study from Columbia University's Teachers College on EdX and Coursera courses indicated that their MOOC certificate programs had completion rates of 15 percent or less.

Can I take 2 Coursera courses at once? ›

Yes, you will be able to enroll in as many courses as you desire. Please note that not all courses are included in Coursera Plus.

What is the easiest course in Coursera? ›

Short online courses for beginners
  • AI For Everyone. DeepLearning.AI. ...
  • What is Data Science? IBM Skills Network. ...
  • Hacking Exercise For Health. ...
  • Python for Data Science, AI & Development. ...
  • Stanford Introduction to Food and Health. ...
  • First Step Korean. ...
  • Fundamentals of Graphic Design. ...
  • Design Thinking for Innovation.

What happens if a student fails a course? ›

If you fail a class, you'll get a 0 on your transcript — and that can bring down your GPA. Failed classes count toward your GPA, though some colleges do not count pass/fail classes in your GPA calculation. If you get an F, you still have to pay for the class without receiving any credit toward your degree.

Does failing a course affect GPA? ›

Failed grades are calculated in your GPA, if you repeat the course and achieve a passing grade, the failing (or lower) grade is excluded from the GPA calculations. The passing (or higher) grade is included in the GPA calculations. Failing a course(s) can also impact your tentative graduation date and student loans.

Can professors pass you even if you fail? ›

Anyway: yes, unless your university has a policy that forbids it (e.g., a policy saying that all professors of a given course have to grade the same way), this policy is almost certainly allowed.

What is project initiation checklist? ›

A good project initiation checklist should include your goals, possible risks and challenges, getting the right tools for your team, team roles and performance, good KPIs, and constant revision. If a project manager can execute these points, they are guaranteed project success. First published on May 24, 2022.

What are the main stages in initiation of work? ›

  • Initiation Phase. During the first of these phases, the initiation phase, the project objective or need is identified; this can be a business problem or opportunity. ...
  • Planning Phase. ...
  • Implementation (Execution) Phase. ...
  • Closing Phase.

What are the 5 phases of a project? ›

Five stages of project management
  • initiation.
  • planning.
  • execution.
  • monitoring and control.
  • closure.

What are the 7 C's of project management? ›

There are seven core elements that if considered will contribute to the organization's project decision-making process. The seven elements (7 C's) are: customers, competitors, capabilities, cost, channels, communication, and coordination.

What are the four 4 pillars of project management? ›

Organizations can take steps to avoid these problems and enhance the probability for project success by building or reinforcing the four pillars of effective IT program management – IT Portfolio Management, Governance, Risk Management and Enterprise Architecture.

What are the four pillars of the project? ›

The Four Pillars Of Project Management - Scope, Time, Cost And Quality.

What is the main goal of project initiation? ›

The initiation phase is the beginning of the project. In this phase, the idea for the project is explored and elaborated. The goal of this phase is to examine the feasibility of the project.

What are the first thing a project manager needs to consider during the initiation phase? ›

Determine Project Requirements in the Initiation Phase. The first activity in the project management initiation phase is determining project requirements.

What is the main purpose for initiating a project? ›

The project initiation phase is important for several reasons. The main reason is that during this stage, project managers assemble a project team and create project documentation to convince stakeholders of the project's value.

What is the most important step before starting a project? ›

A project plan is a critical project management step, and skipping it will put your project's success in jeopardy before it even kicks off. A project plan can show you the resources required, how long it will take to achieve, and help you avoid roadblocks that could throw you off schedule.

What are the two main parts of the project initiation phase of the life cycle? ›

The initiating phase of the project life cycle consists of two separate processes: the project charter and stakeholder register. This phase is to determine the vision for your project, document what you hope to accomplish through a business case, and secure approvals from a sanctioning stakeholder.

Who is responsible for initiating a project? ›

The first thing that will happen in the Initiation phase is the assignment of project manager. The performing organization appoints a Project Manager to lead the project team and manage the project.

What are the key components of project initiation? ›

Key components of project initiation:
  • Project Goals.
  • Scope of the Project.
  • Project Deliverables.
  • Success Criteria.
  • Project Stakeholders.
  • Project Resources.
Oct 5, 2022

What are the seven 7 stages of project cycle? ›

The Project Lifecycle consists of seven phases intake, initiation, planning, product selection, execution, monitoring & control, and closure. These phases make up the path that takes your project from start to finish.

What is the process of initiating? ›

Those processes performed to define a new project or a new phase of an existing project by obtaining authorization to start the project or phase. Within the initiating processes, the initial scope is defined and initial financial resources are committed.

What are the three C's of project management? ›

The 3 C's of Project Management: Clarity, Culture, Course Correction.

What are the 3 R's of project management? ›

Project Management 3 R's – Reduce, Reuse, Revise.

What are the 3 critical elements in a project plan? ›

The three major parts of a project plan are the scope, budget and timeline. They involve the following aspects: Scope. The scope determines what a project team will and will not do.

How do you reveal answers on Google quiz? ›

  1. Open your Google Form.
  2. Click on "Responses."
  3. After you've opened the Responses tab, you will be able to view answers in three different ways: "Summary," "Question," and "Individual." Click on the "Summary" tab to view a summary of all answers submitted to your Google Form.

How do I see all answers in Google Forms 2022? ›

Open your form in Google Forms > Click Responses > Click Question to view the answers by question.

How do you check answers on Quizizz? ›

Go into your library and select the quiz you want to see. On the Quiz Details page, press the show answers button to see answers.

Top Articles
Latest Posts
Article information

Author: Tish Haag

Last Updated:

Views: 6470

Rating: 4.7 / 5 (47 voted)

Reviews: 94% of readers found this page helpful

Author information

Name: Tish Haag

Birthday: 1999-11-18

Address: 30256 Tara Expressway, Kutchburgh, VT 92892-0078

Phone: +4215847628708

Job: Internal Consulting Engineer

Hobby: Roller skating, Roller skating, Kayaking, Flying, Graffiti, Ghost hunting, scrapbook

Introduction: My name is Tish Haag, I am a excited, delightful, curious, beautiful, agreeable, enchanting, fancy person who loves writing and wants to share my knowledge and understanding with you.